Stratford Rail Underpass

Working closely with Midcoast Council and Safedirection, Guardrail Systems had to come up with a solution to protect a critical structure supporting a bridge on the north coast rail line. Given the minimal space from shoulder and lack of drainage, the perfect solution was to trial a product that had only ever been installed to crash test. Crocguard!

Read More
Tim Brenton
Pacific Cape

Guardrail Systems was engaged by Richard Crookes Constructions to supply and install Rhino-Stop Elite for their Pacific Cape Project

Read More
Tim Brenton
Scone Bypass

Guardrail Systems was awarded the contract for the installation of safety barriers on the construction of the Scone bypass. Due to installing the barriers after the final layer of asphalt, an extremely tight deadline had to be met. The team made sure our deadline was met with install records of 628m and 732m of ezyguard on consecutive days.

Read More
Tim Brenton