Guard Rail Systems has been delivering high quality workmanship for over 20 years.
Take a look at some of our previous work:
Working closely with Midcoast Council and Safedirection, Guardrail Systems had to come up with a solution to protect a critical structure supporting a bridge on the north coast rail line. Given the minimal space from shoulder and lack of drainage, the perfect solution was to trial a product that had only ever been installed to crash test. Crocguard!
A technical one, Cory Street bridge approach Thrie-beam needed to be curved to suit the road, which was not at the same alignment as the bridge.
Guardrail Systems was approached by a local construction firm to find a solution to protect a high drop off of the edge of a driveway/carport on a lakeside property. Rhino-Stop Elite was a perfect fit being crash tested to comply with Australian standards, as well as aesthetically pleasing.
Guardrail Systems was awarded the contract for the installation of safety barriers on the construction of the Scone bypass. Due to installing the barriers after the final layer of asphalt, an extremely tight deadline had to be met. The team made sure our deadline was met with install records of 628m and 732m of ezyguard on consecutive days.
Working with the Mid Western Regional Council we were able to complete the upgrade of the Castlereagh Highway barriers in only 8 days.
Working with Singleton Council on their Hunter valley project we installed 1000m of Ezyguard with Motorcycle Protection railing.
Working with Baulderstone on the Karuah to Bulahdelah Pacific Highway Stage 1 we installed 3268m of guardrail including 82 terminals and 3034m flexfence wire rope.